Operational Planning APS
Automatic construction of the optimal executable plan taking into consideration Work in Progress (WIP) and issuing shift and daily work assignments to workplaces.
Operational Planning APS
Automatic construction of the optimal executable plan taking into consideration Work in Progress (WIP) and issuing shift and daily work assignments to workplaces.

APS revolutionizes production scheduling with its automated, constraint-aware scheduling capabilities. This product automatically generates optimal resource schedules while considering all relevant constraints and variables. In addition, it provides the flexibility to adapt to system deviations, monitor order progress, forecast material and component consumption, and plan procurement efficiently.
APS revolutionizes production scheduling with its automated, constraint-aware scheduling capabilities. This product automatically generates optimal resource schedules while considering all relevant constraints and variables. In addition, it provides the flexibility to adapt to system deviations, monitor order progress, forecast material and component consumption, and plan procurement efficiently.

APS FEATURES

  • Operational detailed planning of shift tasks for workplaces
  • Provides operational assessment of plan feasibility, highlighting lagging orders
  • Plan-fact analysis of position readiness for orders/products
  • Offers analytical widgets to monitor the progress of orders and the overall production process
  • Comparison of production plan options
  • Automatically releases production to compensate for defective products
  • Planning with:
    • Inaccessibility of equipment (maintenance schedule)
    • Work in Progress (WIP)
    • Adjustments on machines
Detailed calculation of the production plan in 1,000,000 operations in 45 minutes!

    APS BENEFITS

    • Provides a transparent picture of production load for each workplace
    • Calculates multiple plan options and allows you to select the optimal one
    • Generates a complete and detailed work schedule for each resource and worker, presenting ready-made shift tasks for every
    • Calculates the lead/lag of the production plan
    • Schedules setups only for jobs that can be completed
    • Forecasts material and component consumption precisely in relation to a detailed production plan down to the second