Calculation of the optimal production batch:
• Grouping operations
• Lot sizing based on allowable processing time on the machine
• Specifying rigid lot sizes
• Launch control with limiting queues in front of Distribution Centre in hours, pieces, tasks
• Limiting the number of machines set up for one operation